National Track Renewals Design Contract

Browser does not support script.

Project Introduction

Dates: 2000 to date
Client Name: Network Rail
Client Type: Infrastructure owner

Project Background

Network Rail is required to ensure its infrastructure is maintained and improved to meet the requirements of the modern railway. In order to deliver this Network Rail has an ongoing programme for the renewal of its track work. The National Track Renewals Design contract is the means by which Network Rail is procuring the designs for the Switch and Crossings (S&C) replacement programme. The design element enables new and improved technologies to be incorporated into the network, thus improving its reliability.

Scott Wilson is the multi-disciplinary design consultant for the S&C work across Network Rail’s southern and western territories. As the multi-disciplinary design consultant Scott Wilson is providing permanent way, signalling and telecoms, railway electrification and power engineering, civil and structural and track bed engineering design services.

This programme of works has included a number of challenges, namely the requirement to incorporate all the new design elements within the framework of the existing railway, whilst ensuring the interfaces are safe. In addition, designs must allow for installation within prescribed track access arrangements and may require staged works. These challenges have been overcome by developing effective working relationships between ourselves as the designer, the infrastructure owner Network Rail and several installation contractors.

Project Scope

To provide integrated outline and detailed design for switch and crossing renewals on the UK rail network, including surveys of all the infrastructure affected by the proposed designs. 

In addition Scott Wilson provided Network Rail with the final approved ‘for construction’ drawings for all disciplines.

Value Adding Project Achievements

Since 2000, we have delivered in excess of 500 installation designs all of which have been successfully installed.  Scott Wilson’s designs were delivered on schedule to allow all Switch and Crossing installations to occur and be commissioned on programme.

Working with installation contractors and manufacturers, Scott Wilson evolved methods of staging installations, which enabled more effective use of track access times.  This led to a more efficient installation programme.